The approximation is derived from m/L = ρπ(d/1,000)²/4 with assumed steel density 7,850 kg/m³; 1/162 is a rounded coefficient.
Rebar calculator
Use the free rebar calculator. Enter your values for an instant result and review the calculation formula and assumptions.
- Enter the known values.
- Apply the displayed formula.
- Review the result and supporting values.
Worked example: Confirm the bar standard and lap schedule.
Estimate notice: This rebar result is an estimate based only on the values and assumptions shown. Verify important decisions with the relevant official source or a qualified professional.
Understand the result before using it
Rebar uses total bar length, bar diameter, and waste to calculate its result. It converts project dimensions into an estimated material quantity using an idealized coverage or volume model.
Formula, assumptions, and example
Metric rebar mass ≈ d²/162 kg/m × length × waste factor
Assumptions
- The entered total bar length, bar diameter, and waste are complete, valid, and use the units or format shown beside each field.
- Dimensions describe the intended finished geometry and use compatible units.
- Site conditions, openings, compaction, overlap, cuts, and waste are included only if represented by an input.
- The d²/162 rule approximates a circular steel bar using a density near 7,850 kg/m³; it is not an exact mass standard.
- The entered diameter is the nominal metric diameter, not a US bar number or a measurement across raised ribs.
- The input length must come from a suitable schedule. This tool does not design reinforcement, laps, anchorage or spacing.
For a scheduled total of 120 m of nominal 12 mm bar, the calculator's approximate unit mass is 12² ÷ 162 = 0.8888889 kg/m. With a 5% allowance, 120 × 0.8888889 × 1.05 = 112 kg. A supplier table may round the unit mass to 0.888 kg/m, so the quote can differ slightly.
Good uses
- Prepare an early material takeoff or purchasing estimate.
- Compare project dimensions or waste allowances.
- Check a manual quantity calculation before requesting supplier pricing.
Common mistakes to avoid
- Actual yield varies with workmanship, substrate, product specification, settling, and site conditions.
- Do not use an estimate as a structural design, code check, or substitute for a supplier or qualified professional.
- Check the formula, source data, units, and displayed precision before relying on the result.
- Entering 0.012 in a millimetre field instead of 12.
- Expecting the waste percentage to calculate lap and hook lengths automatically.
- Using this diameter rule for mesh sheets, hollow sections or non-steel reinforcement.
Sources and further reading
These references explain the underlying standards or provide authoritative context. Your own contract, institution, clinician, product documentation, local code, or governing standard may be the controlling source.
Fabricator's nominal unit-mass table provides a supplier cross-check, including 0.888 kg/m for 12 mm bar; use the applicable product schedule for orders.
Authoritative definitions for the measurement units used in estimates.
Primary sources for required safety factors, coverage rates, waste allowances, and code compliance.
Questions about this calculation
What does the Rebar calculate?
Rebar uses total bar length, bar diameter, and waste to calculate its result. It converts project dimensions into an estimated material quantity using an idealized coverage or volume model. The formula used is: Metric rebar mass ≈ d²/162 kg/m × length × waste factor
Which inputs affect the Rebar result?
The result uses total bar length, bar diameter, and waste. Changing any of these values can change the output, so enter them using the labels and units shown.
Is the Rebar result exact?
This rebar result is an estimate based only on the values and assumptions shown. Verify important decisions with the relevant official source or a qualified professional.
When should I verify a Rebar result?
Verify it before any financial, health, academic, construction, safety, or engineering decision. Use the primary source or an appropriately qualified professional.
Clear answers, without the guesswork
Take total length from the bar schedule, including the specified hooks and laps: here 120 m.
Square the nominal diameter in millimetres and divide by 162: 144 ÷ 162 ≈ 0.8888889 kg/m.
Multiply by the total length: approximately 106.6667 kg before allowance.
Apply the chosen 5% allowance once: 106.6667 × 1.05 ≈ 112 kg.
Calculator's d²/162 approximation for 120 m plus 5%; rounded for display, not a bar standard.
| Nominal diameter | Approximate kg/m | Mass with allowance |
|---|---|---|
| 10 mm | 0.617284 | 77.778 kg |
| 12 mm | 0.888889 | 112.000 kg |
| 16 mm | 1.580247 | 199.111 kg |
Your calculation inputs
Calculator values are processed locally in your browser and are not sent to UnitMora's servers. Advertising partners may separately use cookies or similar technologies as explained in the Privacy Policy.